Croydon · housing and retrofit
Croydon’s housing ranges from Victorian streets near the town centre to extensive interwar and post-war suburbs. In Purley, the Webb Estate was developed by William Webb from 1888, with building starting in 1898 – individually designed houses on generous, hedged plots that reflected his “garden first” approach.
New Addington began in the 1930s as a garden village promoted by the First National Housing Trust, and was completed as a large estate after the Second World War, with the Fieldway estate added later.
Property types
Common local property types in Croydon
- Victorian and Edwardian houses
- Large Edwardian detached houses in Purley
- Interwar suburbs
- Post-war estates, including New Addington
- Newer flats in central Croydon
Local considerations
What tends to shape retrofit here
- The Webb Estate and Upper Woodcote Village are conservation areas, so external changes attract scrutiny
- Bradmore Green in Coulsdon is one of the borough’s older conservation areas
- Post-war estate homes should have their construction type confirmed before wall insulation is chosen
- Large detached houses typically have high heat loss, so room-by-room calculations are worthwhile
Conservation area rules, Article 4 directions and listed building controls are set by Croydon Council and can change. Check the current position before finalising external changes: Croydon conservation areas.
Making an enquiry
Making an enquiry from Croydon
- Tell us the approximate age and type of the house
- Mention if you know the construction is non-traditional
- Tell us if the property is in a conservation area
Services available
Services available in Croydon
- Retrofit Assessment – an on-site survey of how the home is built, heated, ventilated and used – the starting point for a retrofit plan.
- Heat Loss & Heat Demand – room-by-room heat loss (kW) to size a heat pump or radiators, and annual heat demand (kWh) to understand energy use.
- Retrofit Design – specifications and key details that installers can price and build, with junctions and ventilation resolved.
- Retrofit Coordination – one accountable role that plans the improvements in order and manages risks such as damp and poor ventilation.
- All services